Public Sector

The majority of this type of work involves working with and around the general public, often within people's homes, workplaces or in close proximity to them; this can require delicate handling and sensitivity. One of our key strengths is our understanding of the importance of continuous communication throughout the project. Therefore our Site Supervisors will always ensure the customer and other groups affected are advised in advance when certain tasks will be carried out, in order to avoid or minimise any inconvenience.

Our simple ethos is "treat people as you would want to be treated".

ATC Biggleswade

ATC Biggleswade

The works involved the demolition of an existing single storey building at the rear of the site to allow for the construction of an extension of the larger Air Cadet building toward the front of the building by way of a traditional cavity brickwork building with a flat roof. Works also include internal remodelling and refurbishment of the existing building and associated finishes.


- Client: East Anglia RFCA
- Contract Adminitrator: EARFCA
- Contract Duration: 22 weeks
- Contract Value: £394,458
- KPI Score: 58/60

 

Octavia Housing

Octavia Housing

To strip out and re-instate numerous flood damaged properties in London W9 & W11, including new DPC injections and re-plastering.

Added Value: We carried out surveys of the properties prior to stripping out and liaised directly with the tenants on choices of new kitchens, wall and floor finishes Octavia split the works between 3 main contractors. Upon completion of Phase 1 we were the only contractor asked to carry on refurbishing the remaining properties.


- Client: Octavia Housing
- Contract Adminitrator:Brawdia
- Contract Duration: ongoing
- Contract Value: £700,000
- KPI Score: 60/60

 

ATC Chelmsford

ATC Chelmsford

The construction of a single storey extension building to be used by 276 Chelmsford ATC Sqn and separate Country Stores building at EA RFCA HQ, 250 Springfield Road, Chelmsford.


- Client: East Anglia RFCA
- Contract Adminitrator: Rydal Design Services Ltd
- Contract Duration: 22 weeks
- Contract Value: £550,000
- KPI Score: 58/60

 

 

Dinsdale Court

Dinsdale Court

Demolition and replacement of external steel staircases, with new concrete foundations. Careful planning and consideration had to be in place as the flats were in full occupation during the works.


- Client: Barnet Homes
- Contract Adminitrator: John Rowan & Partners
- Contract Duration: 12 weeks
- Contract Value: £350,000
- KPI Score: 56/60

 

 

Ruislip Lido Toilet Refurbishment

Ruislip Lido Toilet

Located in the grounds of the Lido at Ruislip, users of the Lido required beach side toilet facilities. The existing toilets were out of use as the floors of the existing pre-fab units had collapsed due to a history of poor maintenance. We carried out the full refurbishment of the existing public toilets and ancillary services. The brief for the project was to install anti vandal sanitaryware with sensor operated taps, a new pumped sewage system and new mains water storage facility.


- Client: London Borough of Hillingdon
- Contract Adminitrator: MDA Consulting Ltd
- Contract Duration: 16 weeks
- Contract Value: £292,500
- KPI Score: 58/60

 

Various Properties in Hampstead

Ellerdale, Newland Construction, building in Hertfordshire and surrounding areas

Refurbishment of eight properties in the Hampstead area – Fitzjohns Avenue, Frognal Lane, Frognal, Ellerdale Road & Finchley Road.

Awarded a commendation for best housing refurbishment by The Clay Roof Tile Council
- Client: London Borough of Camden
- Contract Administrator: Bailey Partnership
- Contract Duration: 36 weeks
- Contract Value: £650,000
- KPI Score: 55/60

 

 

 

 

 

Watford Rugby Club

Demolition of existing facilities and construction of single storey extension to main clubhouse to provide new changing rooms and shower facilities.


- Client: Watford Borough Council
- Contract Administrator: Clipston Construction Control
- Contract Duration: 18 weeks
- Contract Value: £400,000.00
- KPI Score: 58/60

 

Holywell Surgery, Watford

Hollywell Surgery, Newland Construction, building in Hertfordshire and surrounding areas

Single storey extension to existing GP surgery followed by refurbishment of existing building.


- Client: Herts Partnership NHS Trust
- Architect: Simon Jackson
- Contract Duration: 36 weeks
- Contract Value: £440,000
- KPI Score: 60/60

Reference from Holywell Surgery, Watford

 

 

Grundy Park Leisure Centre, Broxbourne

Grundy Park Leisure, Newland Construction, building in Hertfordshire and surrounding areas

Upgrade and modernation of existing gym including installation of new mezzanine floor


- Client: Borough of Broxbourne
- Contract Adminitrator: John Lester Partnership
- Contract Duration: 12 weeks
- Contract Value: £190,000
- KPI Score: 57/60

 

Briar Close, Finchley – Phases I and II

Briar Close, Newland Construction, building in Hertfordshire and surrounding areas

Formation of new pitched roofs to 5 blocks of flats with tenants in occupation below. Works included new brick gables, fascias and soffits and re-pointing of existing brickwork.

Phase II negotiated following successful completion of Phase I


- Client: Warden Housing Association
- Architect: Philip Gledstone
- Quantity Surveyor: Don Brown
- Contract Value: £450,000
- KPI Score: 59/60

 

ATC BasildonATC Basildon

Demolition of existing RFCA Buildings and construction of new single story meeting hall building, together with associated service connections and state of the art Solar system and air handling units, new tarmac parking area and general landscaping. This project was completed within budget and ahead of programme and within budget.

Added Value: Adapting existing landscape to accommodate new external design, resulting in a more and effective solution for the client and lower maintenance costs for the end user

- Client : RFCA East Anglia
- Architect : Hoopers Architects
- Contract Duration : 26 weeks
- Contract Value: £478,000
- KPI Score: 59/60

 

North Watford Cemetery Mourners Lodge & Shelter

North Watford Cemetery Mourners Lodge & Shelter

The project involved the refurbishment of the existing mourners lodge and construction of a shelter.


- Client: Watford Borough Council
- Architect: JP Associates
- Contract Duration : 19 weeks
- Contract Value: £209,115
- KPI Score: 58/60

 

Click here for reference

ATC BarnetATC Basildon

Formation of a single storey rear extension to the rear of two existing properties with access between two properties; the building consisted of classrooms, offices, kitchen and toilets. The works were completed on time and to a very tight budget.

 

- Client : RFCA Greater London
- Contract Administrator : BPR Architects
- Contract Duration : 20 weeks
- Contract Value: £244,261
- KPI Score: 58/60