Design and Build

The key to a successful Design & Build project is understanding our clients' needs and translating those into a Performance Specification, with a clear and detailed set of Contractors Proposals. By being involved from an early stage we are able to work closely with our Clients to achieve an end product that fully satisfies their needs and is within their budget. We can either be involved at concept stage to advise and obtain planning permission, or work from approved drawings.

We have carried out Design & Build schemes for Schools, Hospitals and commercial clients as well as private residential clients.

 

Hertingfordbury Cowper Primary School

Design and build of a new school hall, classroom, toilets and changing rooms

- Client: The Governors of Cowper School
- Contract Administrator: Wilby & Burnett
- Contract Duration: 22 weeks
- Contract Value: £439,000
- KPI Score: 58/60

 

Mortimer House, Welwyn

Working together with the Client from the very start, we designed this five bedroom property with our in-house team of designers, obtaining planning permission and Building Regulations. Our client was keen to ensure that their house was sustainable. The property is laid out over 3 floors with a biomass boiler and wood pellet storage facility housed in the basement which serves the underfloor heating. Hot water is provided via solar panels and rainwater harvester tanks have been buried in the garden to provide water for washing machines, WC’s and garden usage.

- Client: Private Clients
- Newland Architect: Wastell & Porter
- Newland Engineer: Mason Navarro
- Interior Designer: Newland Interiors
- Contract Duration: 52 weeks
- Contract Value: Withheld
- KPI Score: 60/60

For internal photographs see newlandinteriors.co.uk .

 

Pond House, Hadley Green

Design and build new swimming pool and enclosure to rear of existing house.The property was land-locked by other neighbours and the only access was via a pedestrian gate to the side of the house so the excavation work had to be dug by hand.

-Client: Mr & Mrs Clubb
- Newland Architect: Southgate Associates
- Contract Duration: 26 weeks
- Contract Value: £362,000
- KPI Score: 52/60

 

Cain Close, St Albans

The design and build of 3 no. large three bedroom town houses with private gated access and associated soft and hard landscaping.

- Client: Mr Cain
- Newland Architect: Wastell & Porter
- Newland Engineer: Mason Navarro
- Contract Duration: 43 weeks
- Contract Value: £600,000
- KPI Score: 58/60

 

Haileybury College, Hertford Heath

The design and build of a two storey modern languages centre. Comprising fully glazed entrance foyer, 14 classrooms, toilets and stores with heating provided via a ground source heat pump.

- Client: Haileybury College
- Newland Architect: Wastell & Porter
- Newland Engineer: Stuart Thomas Associates
- Contract Administrator: Ainsley & Partners
- Contract Duration: 52 weeks
- Contract Value: £1.5 million
- KPI Score: 59/60

Reference from Haileybury College

Watford Grammar School For Girls

Watford Grammar School For Girls

The Design and Build of new extensions and internal remodeling to an existing detached building to form a new Sixth Form Centre

- Client : Watford Grammar School for Girls
- Architect : DSC Consultants
- Contract Duration : 50 weeks
- Contract Value: £1.8 million
- KPI Score: TBA