When working in residential properties we know the importance etc we know the importance of being considerate to our clients' wishes and needs. We always aim for an understanding of the daily routine in order to minimise the inconvenience that work on a building site can represent. Once on site we have all the skilled craftsmen and experienced project managers necessary to ensure that the extension blends in with the existing building.

Parkside Flats, Potters Bar

Parkside Flats.jpg

To remove the roof from both the South and North blocks and adding a further 6, 2 bedroom flats to the South block and a further 4, 2 bedroom flats to the North Block. Complete refurbishment works were also caried out to the entrance lobby, stairwells and lighting which also incorporated new fire alarm system for both blocks. New car parking spaces were installed, along with electric vehicle charging stations and metered units, with new landscaping, bins stores and sheds for the residents.

Added Value
Working in a live environment with all other existing flats occupied, care had to be taken when programming works to ensure minimal disruption. Detailed programmes were produced working alongside the management team of Parkside Management. A successful project that was completed on time, under budget and the final result looks fantastic.

- Client: Parkside Management
- Contract Administrator: Southgate Assoc
- Contract Duration: 52 weeks
- Contract Value: £1.5 million
- KPI Score: 58/60

 

2 – 4 Cranley Gardens, London SW7

2-4CranleyGardens.png

The Works comprised the complete strip out, alteration and refurbishment of the existing properties at 2 & 4 Cranley Gardens to provide 24 flats of various sizes. Repairs to the external fabric works were carried out and we also added secure bike racks.

- Client: The Wellcome Trust
- Contract Administrator:Savills (uk) Ltd
- Contract Duration: 52 weeks
- Contract Value: £3,830,000
- KPI Score: 58/60

 

 

 

 

53 Argyll Road, London W8

53 Argyll Road

Alteration and refurbishment of the existing property including external works to surrounding areas. Communication and good relations were required with neighbouring properties during this project, especially as the works were halted and started again during the Covid pandemic.

- Client: The Phillimore Estate
- Contract Administrator: Savills (UK) Ltd
- Contract Duration: 20 weeks
- Contract Value: £963,278
- KPI Score: 59/60

 

 

 

Lancaster Road Projects

Lancaster Road Projects

We successfully negotiated the contract for the refurbishment of the 3 existing properties including new kitchens, new bathrooms and new finishes throughout .

- Client: The Wellcome Trust
- Contract Administrator: Savills (uk) Ltd
- Contract Duration: 10 weeks
- Contract Value: Total of 3 projects £346,555
- KPI Score: 57/60

 

 

 

 

13a Cranley Gardens, London SW7

Conversion of an old church vicarage into 4 No individual high-end residential flats. Installation of an internal lift and lift shaft. The existing loft space was increased and the roof rebuilt to provide another floor for the upper flat. All period features were restored throughout to include the external facades and stonework. This is one of over a dozen projects we have completed for the Wellcome Trust.

- Client: The Wellcome trust
- Contract Administrator: Savills (UK) Ltd
- Contract Duration: 50 weeks
- Contract Value: £2 million
- KPI Score: 59/60

 

 

 

HARMER GREEN LANE

Chsiwell House, Newland Construction, building in Hertfordshire and surrounding areas

The project involved the complete stripping and remodeling of the interior including moving the staircase position. We also extended above the original kitchen and formed a glazed extension to the rear.

- Client: Name Withheld
- Contract Administrator:Mount Walker
- Contract Duration: 28 weeks
- Contract Value: With held
- KPI Score: 59/60

 

Chsiwell House, Newland Construction, building in Hertfordshire and surrounding areas

 

 

Chiswell House

New Orangery – Single storey extension to rear of property

- Client: Mr & Mrs Coley
- Contract Administrator: Wastell & Porter
- Contract Duration: 14 weeks
- Contract Value: Withheld
- KPI Score: 59/60

Reference from Chiswell House, Welwyn

This is the second extension we have carried out for this client.

 

 

Station Road, Welham Green

Station Road, Welham, Newland Construction, building in Hertfordshire and surrounding areas

Modern fully glazed 2 storey rear extension to existing listed dwelling including new lift and stairs

- Client: Mr & Mrs Elgar
- Architect: Gelder & Kitchen
- Contract duration: 35 weeks
- Contract Value: approx. £120,000
- KPI Score: 56/60

Reference from Mr P Elgar, Station Road, Welham Green